Road Track Opening & Upgrading

News

  • 2077/07/21 : Upgrade work of 9 km track / road from Siran danda to Olang was initiated. The width of the road is 6m.
  • 2077/07/19 : 6 m wide track opening from Olang to Taal Bagar( Powerhouse) was initiated following an inaguration program.
2024 © All Rights Reserved Doodhpokhari Chepe hydropower | Designed by Smarteyeapps

Developed By: Bipin Bhandari